Executive summary: This independent Wanlin Fire editorial guide explains the official Netherlands source for international buyers, designers and integrators. It is not a copy of the source and is not legal advice. The linked official publication remains authoritative.
What does the official source establish?
- A smoke alarm is required on every floor containing a living room, bedroom or kitchen.
- The property owner or landlord is responsible for installation.
- Official guidance recommends ceiling placement in the hall and regular testing.
What should a buyer, designer or integrator verify?
- Confirm the current Building Decree requirements for the specific building and project date.
- Select CE-marked devices and verify EN 14604 documentation with the exact model.
- Confirm placement, audibility, power source and maintenance responsibility before supply.
Official source and evidence boundary
Jurisdiction: National residential guidance
Issuing body: Government of the Netherlands
Official source: Read the current official publication
Reviewed by: Wanlin Fire Technical Team
Rules, standards and enforcement can change. Confirm the current law, building use, project documents and requirements of the competent authority before specification, installation or purchase.
Frequently asked questions
Does this page replace the official rule?
No. It is a concise sourcing and design aid. Use the official publication and local professional advice for compliance decisions.
Can one detector specification be used in every market?
No. Product standards, language, installation, power, interconnection, documentation and certification must be checked for the destination and application.
What evidence should a supplier provide?
Request the exact model datasheet, conformity documents, test reports, installation instructions, traceability information and written confirmation of project-specific requirements.
Product-selection record
Record the destination, building type, occupancy, detector technology, power supply, interconnection method, acoustic requirements, environmental limits, applicable standards and maintenance plan before approval.

