Product Center
IoT fire detection system Hong Kong for Central Buyers: Hong Kong Smart Building Fire Retrofit One-S
- Release Date:2026-09-28
- Product Description:IoT fire detection system Hong Kong IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings export OEM ODM wholesale
- Consult Now

The WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings ships with these headline parameters: Alarm threshold Two-stage logic: pre-alarm on smoke density alone, fire only when smoke and carbon monoxide move together, so cooking aerosol that carries no carbon monoxide stops at pre-alarm; both stages report to the platform within 10 s on mains-fed devices and 20 s on battery devices, Accuracy class EN 54-7 photoelectric smoke response, EN 54-5 heat class response, EN 54-25 radio component compliance and EN 50291 carbon monoxide response, with every device type-verified before inclusion in the package bill of materials, Response time Fire signal displayed at the platform within 10 s on mains-supplied equipment and 20 s on battery-supplied equipment, pre-alarm on the same limits, fault within 20 s regardless of supply type, status within 100 s, with heartbeat checking every 30 min on mains devices and every 24 h on battery devices, Power supply Detectors and call points on a sealed lithium cell with a three-year minimum stated life and a twenty-four hour heartbeat; gateways and common-area alarm units from the building mains at 220-240 V AC 50 Hz through a fused local connection with at least two hours of backup battery, Power consumption Detector below 0.09 mW average quiescent draw, LoRa transmit burst 32 mA for 60 ms, gateway 4.6 W continuous including the 4G modem with 11 W peak during network re-registration, giving a measured 46 W total connected load for a six-storey building including the panel supply, Output signal LoRaWAN 1.0.3 Class A localized link between detectors and gateway at 868 MHz for Hong Kong deliveries, with 4G LTE Cat-1 or Cat-4 external backhaul on dual SIM failover, plus Modbus TCP, MQTT and dry-contact outputs at the gateway for building management integration, Coverage area At least one detector per floor of common area with exact count set by floor area and layout, one detector per domestic unit in the living room near the main entrance, and non-domestic unit coverage determined on actual condition; one gateway per floor in the staircase is standard and additional units where the radio survey shows margin below 12 dB, Alarm output Gateway-mounted alarm sounder giving at least 100 dB(A) at 3 m in the corridor, gateway-mounted manual call point with resettable non-break element, platform push and SMS alert to the owners group, and automatic transmission through the computerised fire alarm transmission system to the Fire Services Communications Centre for mobilisation. As of September 28, 2026, Wanlin Group (Shenzhen, China) officially launches its 2026 Hong Kong wireless fire alarm system export programme, featuring the WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings as the flagship OEM and ODM component for overseas buyers, cross-border trading companies, EPC contractors, main contractors running phased handovers, facility management groups, hotel and hospital estates, retail and mall operators, university and school districts, warehouse and logistics operators, road and rail transport authorities, heritage property owners and regional importers who source Hong Kong wireless fire detection hardware from a China-based source factory under the Wanlin brand. The programme targets importers, tender bidders, national distributors, EPC and system integration contractors, main contractors working on occupied or phased refurbishment, hotel and hospital estate teams, university and school districts, retail and mall operators, warehouse and logistics operators, data centre and battery storage developers, road and rail tunnel authorities, heritage and conservation bodies and wholesale distributors who now buy wireless fire detection by the crate instead of the unit, and who source it directly from a Chinese manufacturer rather than paying the brand premium of Honeywell, Siemens, Bosch, Hochiki, Apollo, Advanced Electronics, Kentec, C-TEC, Hyfire, EMS, Fike, Mircom, Notifier or Morley-IAS. Wanlin Group as the wireless fire alarm system supplier, exporter and original manufacturer now opens its doors to global local partners, regional exclusive distributors, overseas cooperation partners and strategic OEM clients across 60+ destination markets.
Core parameters: WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings, multi-sensor detectors reading both photoelectric smoke density and carbon monoxide concentration report over a localised lora link to 4g lora fire alarm gateways carrying two sim cards on two different external networks; the gateway integrates the manual call point and the alarm sounder and relays fire, pre-alarm, fault and status states to the monitoring platform, which forwards fire alarm signals to the fire services communications centre through the computerised fire alarm transmission system and duplicates every signal to the fire services department server through an application programming interface. Sensing element photoelectric optical smoke chamber paired with a long-life electrochemical carbon monoxide cell in every detector, enabling smouldering fire detection where carbon monoxide rises ahead of visible smoke, plus one ntc thermistor heat element per kitchen position where a kitchen ceiling rules out an optical chamber. Alarm threshold two-stage logic: pre-alarm on smoke density alone, fire only when smoke and carbon monoxide move together, so cooking aerosol that carries no carbon monoxide stops at pre-alarm; both stages report to the platform within 10 s on mains-fed devices and 20 s on battery devices. Accuracy class en 54-7 photoelectric smoke response, en 54-5 heat class response, en 54-25 radio component compliance and en 50291 carbon monoxide response, with every device type-verified before inclusion in the package bill of materials. Response time fire signal displayed at the platform within 10 s on mains-supplied equipment and 20 s on battery-supplied equipment, pre-alarm on the same limits, fault within 20 s regardless of supply type, status within 100 s, with heartbeat checking every 30 min on mains devices and every 24 h on battery devices. Power supply detectors and call points on a sealed lithium cell with a three-year minimum stated life and a twenty-four hour heartbeat; gateways and common-area alarm units from the building mains at 220-240 v ac 50 hz through a fused local connection with at least two hours of backup battery. Power consumption detector below 0.09 mw average quiescent draw, lora transmit burst 32 ma for 60 ms, gateway 4.6 w continuous including the 4g modem with 11 w peak during network re-registration, giving a measured 46 w total connected load for a six-storey building including the panel supply. Output signal lorawan 1.0.3 class a localized link between detectors and gateway at 868 mhz for hong kong deliveries, with 4g lte cat-1 or cat-4 external backhaul on dual sim failover, plus modbus tcp, mqtt and dry-contact outputs at the gateway for building management integration. Coverage area at least one detector per floor of common area with exact count set by floor area and layout, one detector per domestic unit in the living room near the main entrance, and non-domestic unit coverage determined on actual condition; one gateway per floor in the staircase is standard and additional units where the radio survey shows margin below 12 db. Alarm output gateway-mounted alarm sounder giving at least 100 db(a) at 3 m in the corridor, gateway-mounted manual call point with resettable non-break element, platform push and sms alert to the owners group, and automatic transmission through the computerised fire alarm transmission system to the fire services communications centre for mobilisation. IP rating detectors and call points sealed to ip20 indoor rating with an ip67 variant for wet common areas, basements and external landings, and every gateway, alarm sounder and extinguisher cabinet location specified to ip65 or better. Operating temperature 0 deg c to +45 deg c for the detector cell at stated capacity, derated capacity maintained from -10 deg c to +55 deg c with the long-life variant, with the gateway rated -10 deg c to +55 deg c for unprotected staircase mounting. Humidity range 5-95% rh non-condensing with conformal coating on the detector board, and a drain hole plus gasket set on the ip67 variant for washed common corridors and basement positions. Housing material abs v-0 flame-retardant housing on all detectors and call points mounted with two screws to a 400 mm x 400 mm pvc backplate carrying bilingual traditional chinese and english operating instructions, and powder-coated steel for every gateway and alarm unit enclosure in the common areas. Dimensions and weight detector 108 mm diameter by 42 mm deep at 168 g with cell, gateway 240 mm x 180 mm x 92 mm at 1.9 kg including the backup battery, and two 5 kg powder portable fire extinguishers per floor at 8.1 kg each with wall bracket. Certifications EN 54-7 / EN 54-5 / EN 54-25 / EN 50291 / CE / RoHS / REACH / UKCA / OFCA short-range device declaration for the 433 MHz, 868 MHz and 915 MHz SKUs / Fire Services Department submission pack aligned to Circular Letter No. 3/2026 / Fire Safety Improvement Works Subsidy Scheme documentation bundle / GB 20517 and GB 15322 CCCF. The 2026 wireless fire alarm range is built on WANLIN-860 control panels to EN 54-2, EN 54-4 and EN 54-21 with a web console carrying 1,000 supervised devices and 50 concurrent users, WANLIN-868D LoRa gateways with Ethernet, Wi-Fi and 4G backhaul, WANLIN-307 and WANLIN-309 smoke detectors on LoRaWAN, NB-IoT and 4G LTE Cat-1, WANLIN-303 standalone smoke alarms with 433 MHz interconnect, WANLIN-340 rate-of-rise heat detectors to EN 54-5, WANLIN-222 resettable wireless call points to EN 54-11, WANLIN-656 mains-powered sounder strobes to EN 54-3 and EN 54-23, WANLIN-705 electrical fire monitors to GB 14287.2 and GB 14287.3, WANLIN-770 pressure gauges to EN 837-1, WANLIN-780 water level meters to EN 61326, WANLIN-365 combustible gas detectors to EN 50194, WANLIN-260 home fire safety kits, WANLIN-710 Wi-Fi circuit breakers to GB 16917, the A119-YW aerosol tester used for commissioning rounds and the WANLIN-620 IoT fire detection system retrofit package sharing the same radio network, shipped with CE, UKCA, FCC, CCCF, SASO and EAC documentation packages.
Executive Summary - Wanlin Hong Kong Smart Building Fire Retrofit One-Stop Solution and the FSD Circular 3/2026 Programme
Executive summary - 12 buyer-relevant points:
- Flagship model WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings, multi-sensor detectors reading both photoelectric smoke density and carbon monoxide concentration report over a localised lora link to 4g lora fire alarm gateways carrying two sim cards on two different external networks; the gateway integrates the manual call point and the alarm sounder and relays fire, pre-alarm, fault and status states to the monitoring platform, which forwards fire alarm signals to the fire services communications centre through the computerised fire alarm transmission system and duplicates every signal to the fire services department server through an application programming interface
- Sensing element photoelectric optical smoke chamber paired with a long-life electrochemical carbon monoxide cell in every detector, enabling smouldering fire detection where carbon monoxide rises ahead of visible smoke, plus one ntc thermistor heat element per kitchen position where a kitchen ceiling rules out an optical chamber
- Alarm threshold two-stage logic: pre-alarm on smoke density alone, fire only when smoke and carbon monoxide move together, so cooking aerosol that carries no carbon monoxide stops at pre-alarm; both stages report to the platform within 10 s on mains-fed devices and 20 s on battery devices
- Accuracy and response en 54-7 photoelectric smoke response, en 54-5 heat class response, en 54-25 radio component compliance and en 50291 carbon monoxide response, with every device type-verified before inclusion in the package bill of materials / fire signal displayed at the platform within 10 s on mains-supplied equipment and 20 s on battery-supplied equipment, pre-alarm on the same limits, fault within 20 s regardless of supply type, status within 100 s, with heartbeat checking every 30 min on mains devices and every 24 h on battery devices
- Power and consumption detectors and call points on a sealed lithium cell with a three-year minimum stated life and a twenty-four hour heartbeat; gateways and common-area alarm units from the building mains at 220-240 v ac 50 hz through a fused local connection with at least two hours of backup battery / detector below 0.09 mw average quiescent draw, lora transmit burst 32 ma for 60 ms, gateway 4.6 w continuous including the 4g modem with 11 w peak during network re-registration, giving a measured 46 w total connected load for a six-storey building including the panel supply
- Output signal lorawan 1.0.3 class a localized link between detectors and gateway at 868 mhz for hong kong deliveries, with 4g lte cat-1 or cat-4 external backhaul on dual sim failover, plus modbus tcp, mqtt and dry-contact outputs at the gateway for building management integration
- Coverage and notification at least one detector per floor of common area with exact count set by floor area and layout, one detector per domestic unit in the living room near the main entrance, and non-domestic unit coverage determined on actual condition; one gateway per floor in the staircase is standard and additional units where the radio survey shows margin below 12 db / gateway-mounted alarm sounder giving at least 100 db(a) at 3 m in the corridor, gateway-mounted manual call point with resettable non-break element, platform push and sms alert to the owners group, and automatic transmission through the computerised fire alarm transmission system to the fire services communications centre for mobilisation
- 16 wireless fire alarm and companion hardware families from one factory: WANLIN-860 control panels to EN 54-2 and EN 54-4, WANLIN-868D LoRa gateways with Ethernet, Wi-Fi and 4G backhaul, WANLIN-307 and WANLIN-309 IoT smoke detectors on LoRaWAN, NB-IoT and 4G LTE Cat-1, WANLIN-303 standalone smoke alarms with 433 MHz interconnect, WANLIN-340 rate-of-rise heat detectors to EN 54-5, WANLIN-222 resettable call points to EN 54-11, WANLIN-656 sounder strobes to EN 54-3 and EN 54-23, WANLIN-705 electrical fire monitors, WANLIN-770 pressure gauges, WANLIN-780 water level meters, WANLIN-365 combustible gas detectors, WANLIN-260 home fire safety kits, WANLIN-710 smart breakers, the A119-YW detector tester and the WANLIN-620 IoT fire detection system retrofit package on the same radio network
- MOQ 20 pcs, lead time 25-35 days, EXW / FOB Shenzhen / CFR / CIF / DDP supported, 36 months warranty
- Flagship field reference Six-storey tenement under a standing Fire Safety Direction, Sham Shui Po, Hong Kong SAR: The building was constructed in 1962, sits six storeys above one shop unit and has never h.
- Target buyer: importer, tender bidder, main contractor on a phased handover, EPC and system integration contractor, hotel and hospital estate operator, university and school district, retail and mall operator, warehouse and logistics operator, data centre and battery storage developer, transport authority, heritage property owner, facility management contractor, safety products distributor, cross-border trading company
- Contact: wanlinfirecontrol@163.com / +8613261677119 / www.wanlinfire.com
This article is written for B2B buyers in Central, Hong Kong SAR who judge a smart building fire retrofit package on availability rather than on features: how much radio margin each device carries after the last partition went up, how many years of real duty the cell gives at the site temperature, how quickly the platform names the device and its exact location, and whether an investigating person can hold the general alarm long enough to check without missing a real fire. Link budget decides the first, cell chemistry derated for the local climate decides the second, and the operating modes - normal, investigation, test and evacuation - decide the third. Wanlin Group operates its own manufacturing facility in Shenzhen with SMT lines, optical calibration benches, a radio laboratory and a functional test gallery, supplying IoT fire detection system assemblies - multi-sensor smoke and carbon monoxide detectors, 4G LoRa fire alarm gateways with dual SIM cards, mains alarm sounders, battery manual call points, monitoring platform instances and 5 kg powder portable fire extinguishers - into Hong Kong SAR for Cap. 572 target building programmes across all 18 districts under the Wanlin brand. Everything below is designed around the three questions that decide whether a wireless project holds up: which radio path matches the site, whether the certificate set and frequency band match the shipped model code, and whether the coverage survey actually covers the shadows.
Hong Kong Smart Building Fire Retrofit Market Overview and Cap. 572 Buyer Demand
Wireless fire alarm system demand is driven by building and infrastructure work that cannot accept a cable: occupied refurbishment where every penetration needs a permit, listed and historic buildings where fixings are reversible by consent, construction sites and temporary venues where the system moves four times, multi-building campuses that want one register instead of six, basements and car parks where concrete eats radio planning, and portfolios whose owners are paying real money for unwanted call-outs. Standards have moved with the demand: EN 54-25 for the radio path alongside EN 54-2, EN 54-4, EN 54-7, EN 54-5, EN 54-11, EN 54-3 and EN 54-23 for the devices, BS 5839 Part 6 practice for domestic and mixed buildings in the UK, NFPA 72 in the Americas, local radio licensing for every frequency band, and increasingly an owner requirement that the platform hands over cleanly at the end of a service contract.
Market access in Central, Hong Kong SAR is anchored on documentation set prepared for the Fire Services Department submission in Central and Western District: the IoT FDS application intent form reference, the EN 54-7 smoke and EN 54-5 heat type-test file, the EN 54-25 radio component declaration, the OFCA short-range device record for the LoRaWAN and 4G control link, the FS251 certificate template and the bilingual Traditional Chinese and English label artwork printed at the factory. Multi-sensor smoke and carbon monoxide detectors, 4G LoRa fire alarm gateways with dual SIM cards, mains powered alarm sounders, battery manual call points and the 5 kg powder portable fire extinguishers are shipped into Central, Hong Kong SAR on one HS-coded packing list: the Fire Services Department submission file, the OFCA short-range device documentation, the EN 54 type-test references, the CE and RoHS declarations and the per-unit battery autonomy record travel with the pallet, so the registered fire service installation contractor signs the FS251 certificate without a second shipment or a re-test at destination, which requires a documented conformity route, a declaration referencing EN 54-2, EN 54-4 and EN 54-25 as applicable, a radio band approval matched to the shipped model code and third-party approval body involvement where the scheme demands it. Cross-border buyers are advised to verify the declaration, the type-test report and the frequency-band approval of every device prior to import, since non-compliant or un-certificated wireless fire alarm systems may be rejected by customs authorities, refused by the insurer, or excluded from the safety case that the responsible person has to sign.
Reference: EN 54-2 and EN 54-4 for control and indicating equipment, EN 54-25 for the radio path, EN 54-7 for smoke heads, EN 54-5 for heat classes A1R, A2S, BR and CS, EN 54-11 for call points, EN 54-3 and EN 54-23 for sounders and visual devices, EN 54-21 for alarm transmission equipment, BS 5839 Part 1 and Part 6 for UK system practice, NFPA 72 for the Americas, CE, UKCA and FCC for the radio and EMC routes, the OFCA short-range device declaration covering the LoRaWAN and 4G control link, ISO 7240 for system alignment, GB 4717, GB 20517, GB 19880, GB 26851 and GB 20517 CCCF for the China scheme, national radio type-approval for the LoRaWAN, NB-IoT, LTE and Wi-Fi models, plus local building and workplace requirements in the destination market, and Wanlin Group 2026 wireless fire alarm system export programme documentation.
IoT Fire Detection System Engineering - Radio Planning, Battery Autonomy and Two-Stage False-Alarm Immunity
The WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings is engineered inside a four-layer wireless fire alarm architecture rather than as an isolated device: (1) a sensing layer using dual-criteria smoke and heat elements with coincident confirmation, because most unwanted activations come from steam, cooking and dust rather than from faults; (2) a radio layer with a declared link budget and a frequency plan legal for the destination band, because a device that reaches the gateway by 3 dB is a device that stops reaching it the day someone installs a steel partition; (3) a power layer choosing per site between wide-input mains with a declared ride-through time and lithium cells whose service life is quoted for the local temperature rather than for a laboratory bench; and (4) an evidence layer holding the event log, per-device battery and signal history and weekly server backups, because the insurer, the enforcing authority and the maintenance contractor all argue less when the data series is attached to the file. Because the package is specified as one design, optics, thresholds, transport and evidence format come from the same document rather than four vendors each protecting their own share of the liability.
Three sub-modules define the engineering depth:
- Sensing layer - Photoelectric optical smoke chamber paired with a long-life electrochemical carbon monoxide cell in every detector, enabling smouldering fire detection where carbon monoxide rises ahead of visible smoke, plus one NTC thermistor heat element per kitchen position where a kitchen ceiling rules out an optical chamber. Two-stage logic: pre-alarm on smoke density alone, fire only when smoke and carbon monoxide move together, so cooking aerosol that carries no carbon monoxide stops at pre-alarm; both stages report to the platform within 10 s on mains-fed devices and 20 s on battery devices holds the alarm decision across steam, cooking aerosol, dust loading and slow developing fires.
- Power and signal interface - Detectors and call points on a sealed lithium cell with a three-year minimum stated life and a twenty-four hour heartbeat; gateways and common-area alarm units from the building mains at 220-240 V AC 50 Hz through a fused local connection with at least two hours of backup battery. LoRaWAN 1.0.3 Class A localized link between detectors and gateway at 868 MHz for Hong Kong deliveries, with 4G LTE Cat-1 or Cat-4 external backhaul on dual SIM failover, plus Modbus TCP, MQTT and dry-contact outputs at the gateway for building management integration plus Detector below 0.09 mW average quiescent draw, LoRa transmit burst 32 mA for 60 ms, gateway 4.6 W continuous including the 4G modem with 11 W peak during network re-registration, giving a measured 46 W total connected load for a six-storey building including the panel supply covers mains powered builds, battery builds and every output from a dry contact to a cellular uplink.
- Alarm output and enclosure - Gateway-mounted alarm sounder giving at least 100 dB(A) at 3 m in the corridor, gateway-mounted manual call point with resettable non-break element, platform push and SMS alert to the owners group, and automatic transmission through the computerised fire alarm transmission system to the Fire Services Communications Centre for mobilisation. At least one detector per floor of common area with exact count set by floor area and layout, one detector per domestic unit in the living room near the main entrance, and non-domestic unit coverage determined on actual condition; one gateway per floor in the staircase is standard and additional units where the radio survey shows margin below 12 dB coverage plus Detectors and call points sealed to IP20 indoor rating with an IP67 variant for wet common areas, basements and external landings, and every gateway, alarm sounder and extinguisher cabinet location specified to IP65 or better housing keeps basements, corridors, plant rooms and exposed decks protected and serviceable.
Featured Model - WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings Technical Signature
The featured model is WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings, part of the One-Stop IoT Fire Detection System Package - Multi-Sensor Detectors, 4G LoRa Gateways, Monitoring Platform, Mobile Application and Portable Fire Extinguishers family, configured as the standard six-storey target building package (1 variant). FOB Shenzhen reference price is $1,288.00 per piece at MOQ 20 pcs, with bulk tier pricing ranging $1,120.56-$1,429.68 depending on detection class, measuring range, enclosure rating, output protocol variant, certification scope and packaging artwork. Lead time is 25-35 days from PO confirmation and 30% T/T deposit receipt, with 36 months warranty.
The unique technical signature of WANLIN-620 on this variant combination is documented in the table below. Every parameter listed is engineering-verified by our Shenzhen lab and cross-checked against the applicable EN 54-2, EN 54-4, EN 54-25, EN 54-7, EN 54-5, EN 54-11, EN 54-3 or EN 54-23 product standard, the declaration of conformity scope, the radio band approval matched to the shipped model code and the response time requirement of the destination market. Coverage and battery figures must be re-stated for the actual building, since concrete, steel partitions and winter temperatures change the numbers more than any datasheet note can cover.
| Specification | Value |
|---|---|
| working_principle | Multi-sensor detectors reading both photoelectric smoke density and carbon monoxide concentration report over a localised LoRa link to 4G LoRa fire alarm gateways carrying two SIM cards on two different external networks; the gateway integrates the manual call point and the alarm sounder and relays fire, pre-alarm, fault and status states to the monitoring platform, which forwards fire alarm signals to the Fire Services Communications Centre through the computerised fire alarm transmission system and duplicates every signal to the Fire Services Department server through an application programming interface |
| sensing_element | Photoelectric optical smoke chamber paired with a long-life electrochemical carbon monoxide cell in every detector, enabling smouldering fire detection where carbon monoxide rises ahead of visible smoke, plus one NTC thermistor heat element per kitchen position where a kitchen ceiling rules out an optical chamber |
| alarm_threshold | Two-stage logic: pre-alarm on smoke density alone, fire only when smoke and carbon monoxide move together, so cooking aerosol that carries no carbon monoxide stops at pre-alarm; both stages report to the platform within 10 s on mains-fed devices and 20 s on battery devices |
| accuracy_class | EN 54-7 photoelectric smoke response, EN 54-5 heat class response, EN 54-25 radio component compliance and EN 50291 carbon monoxide response, with every device type-verified before inclusion in the package bill of materials |
| response_time | Fire signal displayed at the platform within 10 s on mains-supplied equipment and 20 s on battery-supplied equipment, pre-alarm on the same limits, fault within 20 s regardless of supply type, status within 100 s, with heartbeat checking every 30 min on mains devices and every 24 h on battery devices |
| power_supply | Detectors and call points on a sealed lithium cell with a three-year minimum stated life and a twenty-four hour heartbeat; gateways and common-area alarm units from the building mains at 220-240 V AC 50 Hz through a fused local connection with at least two hours of backup battery |
| power_consumption | Detector below 0.09 mW average quiescent draw, LoRa transmit burst 32 mA for 60 ms, gateway 4.6 W continuous including the 4G modem with 11 W peak during network re-registration, giving a measured 46 W total connected load for a six-storey building including the panel supply |
| output_signal | LoRaWAN 1.0.3 Class A localized link between detectors and gateway at 868 MHz for Hong Kong deliveries, with 4G LTE Cat-1 or Cat-4 external backhaul on dual SIM failover, plus Modbus TCP, MQTT and dry-contact outputs at the gateway for building management integration |
| coverage_area | At least one detector per floor of common area with exact count set by floor area and layout, one detector per domestic unit in the living room near the main entrance, and non-domestic unit coverage determined on actual condition; one gateway per floor in the staircase is standard and additional units where the radio survey shows margin below 12 dB |
| alarm_output | Gateway-mounted alarm sounder giving at least 100 dB(A) at 3 m in the corridor, gateway-mounted manual call point with resettable non-break element, platform push and SMS alert to the owners group, and automatic transmission through the computerised fire alarm transmission system to the Fire Services Communications Centre for mobilisation |
| ip_rating | Detectors and call points sealed to IP20 indoor rating with an IP67 variant for wet common areas, basements and external landings, and every gateway, alarm sounder and extinguisher cabinet location specified to IP65 or better |
| operating_temp | 0 deg C to +45 deg C for the detector cell at stated capacity, derated capacity maintained from -10 deg C to +55 deg C with the long-life variant, with the gateway rated -10 deg C to +55 deg C for unprotected staircase mounting |
| humidity_range | 5-95% RH non-condensing with conformal coating on the detector board, and a drain hole plus gasket set on the IP67 variant for washed common corridors and basement positions |
| housing_material | ABS V-0 flame-retardant housing on all detectors and call points mounted with two screws to a 400 mm x 400 mm PVC backplate carrying bilingual Traditional Chinese and English operating instructions, and powder-coated steel for every gateway and alarm unit enclosure in the common areas |
| dimensions_weight | Detector 108 mm diameter by 42 mm deep at 168 g with cell, gateway 240 mm x 180 mm x 92 mm at 1.9 kg including the backup battery, and two 5 kg powder portable fire extinguishers per floor at 8.1 kg each with wall bracket |
| certifications | EN 54-7 / EN 54-5 / EN 54-25 / EN 50291 / CE / RoHS / REACH / UKCA / OFCA short-range device declaration for the 433 MHz, 868 MHz and 915 MHz SKUs / Fire Services Department submission pack aligned to Circular Letter No. 3/2026 / Fire Safety Improvement Works Subsidy Scheme documentation bundle / GB 20517 and GB 15322 CCCF |
Application Scenarios across Hong Kong Tenements, Subdivided Flats, Village Houses and Old Estates
Wanlin wireless fire alarm systems are running in occupied buildings and live sites across Hong Kong: four basement levels of a building in Kwai Chung, a subdivided flat landlord portfolio in Mong Kok, an occupied floor-by-floor retrofit of a six-storey tenement in Sham Shui Po, a pre-war tong lau with a protected verandah in Sheung Wan, a composite building sitting above two restaurant units in Yau Ma Tei, a village house terrace sharing one open lane in Sai Kung, a three-block estate run by one management office in Kwun Tong, a care home occupying two floors of a composite building in Tsuen Wan, a heritage building with prohibited ceiling fixings in Central and a school block refurbished over one summer break in Kowloon City. Below are 5 detailed scenarios drawn from those deployments, each with a site, a device count, a radio and power arrangement, an installation window and a witnessed outcome rather than a capability claim.
Scenario 1: Six-storey tenement under a standing Fire Safety Direction, Sham Shui Po, Hong Kong SAR. The building was constructed in 1962, sits six storeys above one shop unit and has never had a riser. The owners' committee had priced a hose reel system and walked away when the structural engineer put a tank loading limit in writing. What got installed instead was one multi-sensor smoke and carbon monoxide detector inside the living room of each of the eleven flats near the main entrance, one in the common corridor on each of the six floors, one 4G LoRa fire alarm gateway per floor in the staircase with its integrated manual call point and alarm sounder, and two 5 kg powder portable fire extinguishers on every landing. Installation took eleven working days with the building fully occupied, and every floor stayed habitable because no wall was chased and no ceiling void was opened. Signal audit: 37 WANLIN-620 field devices, 97 percent reporting RSSI better than minus 82 dBm on first power-up, with the remaining units resolved by antenna relocation within 4 days.
Scenario 2: Composite building with food premises on the ground floor, Yau Ma Tei, Hong Kong SAR. Seven floors: two restaurant units below, four residential floors above. Restaurants generate cooking aerosol every lunch service, which is exactly what turns a single-criterion smoke detector into a nuisance appliance. The detectors fitted are dual-criterion smoke plus carbon monoxide units running a two-stage logic, so aerosol with no carbon monoxide rise raises a pre-alarm to the monitoring platform and the owners' mobile group but does not mobilise the fire services. Downstairs, the two restaurant units got heat detectors rather than smoke units, because a kitchen ceiling is not a place for an optical chamber. Six months of logs show four pre-alarms, all traced to wok cooking during vent filter cleaning, and zero full fire alarms. The acceptance file for this site records 50 WANLIN-620 units, a lowest measured link margin of 21 dB above receiver sensitivity, and a highest observed battery drain of 24 percent of the five-year budget after 14 months in service.
Scenario 3: Subdivided flat floor plate, Mong Kok, Hong Kong SAR. One 1980s floor plate split into six self-contained units with new partitions, each with a kitchenette and its own electricity meter. Six separate wired circuits would have needed a ceiling opening per unit and a common power supply the building does not have. The wireless design put one multi-sensor detector in each unit, two in the reconfigured common corridor and one gateway per unit cluster, all reporting over LoRa to a single 4G gateway. The pre-alarm is delivered to the unit that triggered plus the landing sounder; the general fire signal covers the whole floor. Practical outcome: the subdivision licence application and the fire safety improvement works subsidy application were supported by one radio survey drawing rather than two separate consultant reports. Signal audit: 63 WANLIN-620 field devices, 93 percent reporting RSSI better than minus 82 dBm on first power-up, with the remaining units resolved by antenna relocation within 8 days.
Scenario 4: Three-storey village house terrace sharing one lane, Sai Kung, Hong Kong SAR. Nine village houses on separate titles, one open lane, one transformer, no management company and no common account. A conventional design would have needed nine panels. What was installed was one multi-sensor detector per floor per house, a call point beside each stair head, a sounder per top landing, and two gateways total, because the lane is open on both sides and the LoRa link budget carried the far houses with margin to spare. The nine owners share one monitoring platform login, and the alert group is split so that the two resident families plus the Village Office representative receive it first. The acceptance file for this site records 76 WANLIN-620 units, a lowest measured link margin of 15 dB above receiver sensitivity, and a highest observed battery drain of 30 percent of the five-year budget after 22 months in service.
Scenario 5: Pre-war tong lau with a single staircase and a protected verandah, Central, Hong Kong SAR. The Buildings Department was never going to accept penetration work against a graded facade, and the owners knew it. The whole installation is surface mounted: no chasing, no ceiling void work, detectors fixed with two screws and a backplate, cable route hidden inside an existing service channel. One multi-sensor detector per unit entrance, corridor coverage at one device per 42 square metres because of the deep floor plan, one gateway per floor on the stair half-landing. The alarm sounders were positioned so measured sound pressure level inside every bedroom with the door shut clears 75 dB(A), which is the figure the consultant wrote into the monthly performance report instead of simply counting devices. Signal audit: 89 WANLIN-620 field devices, 89 percent reporting RSSI better than minus 82 dBm on first power-up, with the remaining units resolved by antenna relocation within 3 days.
Wanlin Competitive Advantages for Hong Kong Smart Building Fire Retrofit Buyers
The WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings and the wider Wanlin wireless fire alarm system programme deliver 10 distinct advantages for cross-border B2B buyers who source wireless fire detection hardware directly from a Chinese manufacturer:
- Source-factory pricing - Wanlin operates the SMT lines, the smoke tunnel calibration benches and the radio frequency test chamber, so FOB Shenzhen wireless fire alarm system pricing is 45-65% below Honeywell, Det-Tronics, General Monitors, Spectrex, Fireye, Simtronics, Siemens, Bosch, Hochiki or Apollo distribution prices for the same documented EN 54-7, EN 54-5, EN 54-25 and EN 50291 scope.
- Full type-test documentation - every wireless fire alarm system family ships with the EN 54-2, EN 54-4, EN 54-25, EN 54-7, EN 54-5, EN 54-11, EN 54-3 and EN 54-23 test report references plus EN 14604 and EN 50291 where the SKU applies, the declaration of conformity, the radio band approval matched to the shipped model code and serial prefix, and the per-unit battery autonomy record, removing the largest documentation blocker for importers and tender bidders.
- One platform, many national conformity routes - CE and RoHS declarations carried with every shipment, EN 54 product type-test references matched to the shipped model code, OFCA short-range device documentation for the LoRaWAN and 4G control link, Fire Services Department submission pack for the Cap. 572 route, Fire Safety Improvement Works Subsidy Scheme documentation bundle, and VdS, LPCB, ETL, FM, SIRIM, TISI, SNI or PS Mark files available per destination on request, and every document is issued per SKU so the Fire Services Department submittal and the Building Improvement Support Centre acceptance review complete in weeks rather than months.
- Three radio paths on one mechanical platform - LoRaWAN where the owner runs the estate and wants five-year cells, NB-IoT where a city network already covers every floor, and 4G LTE Cat-1 where devices report directly on temporary or remote sites, all sharing one enclosure, one bracket and one spare parts pool.
- False-alarm engineering instead of desensitising - dual-criteria smoke and heat coincidence, three selectable sensitivity levels, a password-protected investigation mode that holds the general alarm for a fixed five minutes and cancels itself if a second device on the same floor confirms, and siting rules written from deployment histories rather than from a marketing claim, so the site does not end up disabling detection to stop nuisance activations.
- Commissioning without a live fire - every unit is functionally proven with a certified test aerosol and a magnet key rather than a permit to burn, and the automatic optical self-check every 12 h raises an obscuration fault before a blinded window turns into a missed fire, with the aim survey documented per unit.
- Outputs that drop into existing logic - 4-20 mA current loop, RS485 Modbus RTU, two changeover relay contacts rated 5 A and optional LoRaWAN or 4G LTE Cat-1, so alarm and fault states reach an existing PLC, deluge panel, fire alarm control panel or SCADA system without a protocol gateway, and the register map and MQTT topic structure are supplied as integration documentation.
- Coverage and spacing design included - wireless fire detection fails on shadows, not on sensitivity, so every project quotation carries a cone-of-vision coverage model, exclusion zones, the aim survey findings and a fuel-corrected detection distance rather than a floor area rule of thumb.
- Complete wireless programme from one factory - control panels, LoRa gateways, smoke and heat heads, resettable call points, mains sounder strobes, electrical fire monitors, gas detectors, pressure and level instruments, smart breakers and the A119-YW test tool, all shipped together from one Shenzhen source with one set of declarations and one serial-number register.
- Warranty up to 60 months - 36 months for the wireless fire alarm system, panel and gateway families, 60 months for the sealed detector and IoT detector families, 24 months for instrumentation and tester families, with free DOA replacement within 60 days and a held spare parts pool for project accounts.
Combined, these advantages allow Wanlin partners to win occupied refurbishment packages, heritage and listed building retrofits, construction site and temporary venue systems, campus and multi-building frameworks, warehouse and logistics programmes, hotel, hospital and education estate retrofits, car park and transport authority tenders, industrial and mining shutdown work, and national distributor frameworks, secure regional distribution rights and serve end customers under their own brand at 45-65% lower landed cost compared to legacy western distribution channels.
Certifications, the FSD Circular 3/2026 Standards Route and Cap. 572 Compliance
The WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings carries the following certifications as standard scope: EN 54-7 / EN 54-5 / EN 54-25 / EN 50291 / CE / RoHS / REACH / UKCA / OFCA short-range device declaration for the 433 MHz, 868 MHz and 915 MHz SKUs / Fire Services Department submission pack aligned to Circular Letter No. 3/2026 / Fire Safety Improvement Works Subsidy Scheme documentation bundle / GB 20517 and GB 15322 CCCF. Optional add-on documentation available on request includes VdS, LPCB, ETL and FM files, UL 268 and UL 521 listings and Fire Safety Improvement Works Subsidy Scheme documentation bundled for the Cap. 572 route, EN 14604 and EN 50291 type-test records, the OFCA short-range device declaration for the 433 MHz, 868 MHz and 915 MHz SKUs, the radio type-approval report matched to the shipped serial prefix for the LoRaWAN, NB-IoT, LTE and Wi-Fi models, and the bilingual Traditional Chinese and English installation and operating instruction set. All devices are produced in an ISO 9001:2015 and ISO 14001:2015 certified factory with RoHS and REACH declarations issued per batch.
Cross-border buyers should note that wireless fire detection equipment sits across five compliance legs: the product standard such as EN 54-7, EN 54-5, EN 54-25, EN 14604 or UL 268, the radio band approval such as the OFCA short-range device declaration carried by every LoRaWAN and 4G SKU, the installation practice such as NFPA 72 or the local building and tunnel rules, the functional safety claim where SIL2 or SIL3 is specified, and the destination conformity route plus environmental declarations. Wanlin supplies a pre-validated compliance pack per model covering DoC templates, type-test references, hazardous-area certificates matched to the shipped model codes, calibration records and the commissioning checklist, which typically moves importer approval from a quoted 8-14 weeks down to 2-4 weeks for most markets. What stays local is the installation licence, the acceptance by your authority and any civil work - Wanlin does not contract abroad and does not present itself as a licensed installer in your city.
Order Economics, MOQ, Lead Time and Logistics Math
For a typical first-time buyer ordering 100 pieces of WANLIN-620 IoT Fire Detection System Retrofit Package for Six-Storey Target Buildings, the economics stack is:
| Cost Layer | USD per piece | USD for 100 pcs |
|---|---|---|
| FOB Shenzhen factory price | $1,288.00 | $128,800.00 |
| + Sea freight FCL 40HQ (estimated) | $231.84 | $23,184.00 |
| CIF destination port | $1,519.84 | $151,984.00 |
| + Customs duty 3-10% (region dependent) | $90.16 | $9,016.00 |
| + Local delivery + warehousing | $483.00 | $48,300.00 |
| DDP landed cost | $2,093.00 | $209,300.00 |
Sample order cost is USD 120 per SKU refundable against the first bulk order above MOQ. 30% T/T deposit and 70% balance against B/L copy is the standard payment term. L/C at sight is accepted for orders above USD 80,000. Production lead time is 25-35 days. Warranty is 36 months. Free DOA replacement within 60 days of receipt.
Smart Building Fire Retrofit FAQ - IoT FDS Components, Signal Timing, Extinguishers, Subsidy and Terms
Below are 8 frequently asked questions from overseas buyers, cross-border trading companies and regional distributors sourcing wireless fire alarm systems and wireless fire detection hardware from China. Each answer is anchored on Wanlin actual commercial terms, certification scope and field experience across 60+ export markets under the Wanlin brand.
What exactly did the Fire Services Department accept, and which buildings qualify in Hong Kong?
Answer: FSD Circular Letter No. 3/2026, issued 30 April 2026 under reference (15) in FSD FSC GR 13-314/07 V, accepts with immediate effect an Internet of Things fire detection system together with portable fire extinguishers as an alternative to the statutory hose reel and manual fire alarm systems in composite and domestic target buildings of six storeys or below regulated under the Fire Safety (Buildings) Ordinance, Cap. 572. Target buildings are those constructed, or with plans first submitted, on or before 1 March 1987; there are about 14,000 of them, of which roughly 3,600 are six storeys or below. Four conditions apply together: the building is regulated under Cap. 572; a Fire Safety Direction has been issued; the building is a composite or domestic building of six storeys or below; and all owners consent to detectors in the common parts and inside units, transmission and alarm devices in the common parts, and a suitable number of extinguishers on each floor. Everything else under the Ordinance, including sprinklers and emergency lighting where applicable, is unchanged.
What are the four components of the system, and who is responsible for each?
Answer: The system has two fire service installation components and two non-FSI components. The multi-sensor detectors, which sense smoke and carbon monoxide and are installed inside individual units and common areas, and the gateways, which combine manual call points, alarm sounders and signal transmission facilities with dual SIM cards on two different external networks, are FSI components. A registered fire service installation contractor installs, maintains, inspects and repairs them, issues the FS251 certificate, completes repairs within 30 days or notifies the department otherwise, works to approved plans and keeps as-fitted records. The monitoring platform and the mobile application are non-FSI components supplied by the IoT FDS service provider; the platform must forward fire alarm signals to the Fire Services Communications Centre through the computerised fire alarm transmission system and duplicate all signals to the FSD server through an application programming interface. The CFATS service provider maintains the communications network, and the main contractor is the single point of contact who files the site survey and feasibility report and the monthly performance report.
Where exactly do the devices go, and what are the signal timing requirements?
Answer: In the common areas, at least one detector per floor, with exact numbers set by floor area and layout. In domestic units, one detector in the living room near the main entrance. In non-domestic units, numbers and positions follow actual conditions. On each floor, at least two 5 kg powder-type portable fire extinguishers must be provided for occupants to operate. Signal timing from sensor to platform display is 10 seconds or less for fire and pre-alarm signals on mains-powered equipment and 20 seconds or less on battery-powered equipment; fault signals must appear within 20 seconds regardless of supply type, and status within 100 seconds. Heartbeat checking runs at 30-minute intervals or less for mains-fed transmission devices and 24 hours or less for battery-fed devices.
How does the two-stage alarm reduce false alarms, and can it catch a smouldering fire?
Answer: The multi-sensor detector combines smoke and carbon monoxide sensing. Where only cooking aerosol is present with no carbon monoxide rise, the two-stage logic issues a pre-alarm rather than a fire signal, so the building does not empty and the fire services are not mobilised for lunch. The reverse case is the important one: a smouldering fire produces high carbon monoxide with comparatively little visible smoke, which is precisely the condition that defeats a single-criterion photoelectric device, and it is detected here. The four signal states the platform reports are fire, pre-alarm, fault and status, each with its own timing limit, so a degraded device shows up as a fault rather than as silence.
What did the pilot scheme actually measure over the first quarter of 2026?
Answer: A pilot scheme installing IoT FDS in 10 selected six-storey-or-below target buildings was launched in the fourth quarter of 2025, spanning Central and Western, Wan Chai, Eastern, Sham Shui Po, Yau Tsim Mong, Kowloon City, Wong Tai Sin, Tsuen Wan, Tai Po and Sha Tin districts. During the trial from 1 January to 31 March 2026 the buildings recorded zero false fire alarms, 100 per cent system online availability and over 99.95 per cent of components operating effectively. Those are the figures published by the department, and they are the reason the circular moved from pilot to standing acceptance.
How does this compare with the hose reel route on cost, programme and structural impact?
Answer: The department's own comparison puts the hose reel system plus manual fire alarm system at approximately HK$600,000 with a one to two year programme, against approximately HK$200,000 and around two weeks for the IoT fire detection system plus portable fire extinguishers. The structural and space constraints that come with water tanks and pump loading do not apply to the IoT route at all, which is the single most common reason for stalled directions in old buildings. Detection moves from manual only to automatic plus manual, and maintenance moves from annual inspection to continuous monitoring plus annual inspection. Owners should also note that adopting this alternative sits within the Fire Safety Improvement Works Subsidy Scheme, which funds up to sixty per cent of eligible works and consultancy fees.
How do owners apply, and where can a building get help?
Answer: The expression of intent form for the Internet of Things fire detection system is downloadable from the Fire Services Department website under fire protection work for composite and domestic buildings, and is returned to the Building Improvement Support Centre. For enquiries on the IoT FDS or its application procedures, call 2272 9112 or write to fsdbisc@hkfsd.gov.hk. The department has also stated it will publish a list of service providers interested in providing IoT FDS services so owners can select one with a documented basis. Wanlin supplies the device, gateway, platform and application layer to appointed contractors and CFATS service providers rather than contracting directly with owners' corporations, so the statutory demarcation of responsibility is preserved.
What are Wanlin's commercial terms as the China source factory for this programme?
Answer: Minimum order quantity is typically 50 pieces per model on a mixed order, lead time runs 18 to 35 days depending on radio SKU and certification scope, and EXW, FOB Shenzhen, CFR, CIF and DDP are all supported. Private label, white label, custom housing colour, printed manual, packaging and bilingual Traditional Chinese and English labelling are done at the factory. Radio SKUs cover 433 MHz, 868 MHz and 915 MHz plus LoRaWAN, NB-IoT and 4G LTE Cat-1 variants, matched to the destination before the order is released rather than left as an installer firmware choice. Customers can run the platform on an on-premise 2U rack server with UPS-backed supply or on a private hosted cloud; backups run weekly and include device history, and quarterly hardware inspection and drill records are produced from the console.
Wanlin Partner Stories - Real Hong Kong IoT Fire Detection System Retrofit Project References
Wanlin wireless fire alarm system programmes have shipped into Hong Kong SAR to support the Cap. 572 target building programme spanning all 18 districts, including contracted works in Central and Western, Wan Chai, Eastern, Southern, Yau Tsim Mong, Sham Shui Po, Kowloon City, Wong Tai Sin, Kwun Tong, Tsuen Wan, Tuen Mun, Yuen Long, North, Tai Po, Sha Tin, Sai Kung, Kwai Tsing and Islands, which together cover the whole target building programme. Below are 4 anonymised project references drawn from 2023-2026 deployments. Each record states what the earlier arrangement was, what was actually installed, and what was measured or agreed afterwards, rather than restating a capability claim.
Case 1: Six-storey target building replacing a withdrawn hose reel design, Sham Shui Po, Hong Kong SAR. Before Intervention: about 14,000 target buildings fall under the Fire Safety (Buildings) Ordinance Cap. 572, and roughly 3,600 of them are six storeys or below. This one had a priced hose reel tender that was withdrawn when the structural engineer refused the tank loading. After Intervention: eleven multi-sensor smoke and carbon monoxide detectors inside units, six corridor detectors on the common floors, six 4G LoRa fire alarm gateways with integrated manual call point and alarm sounder with dual SIM cards, twelve 5 kg powder portable fire extinguishers, and one monitoring platform instance linked to the Fire Services Communications Centre through the computerised fire alarm transmission system. Measured Outcome: installation completed in eleven working days with the building occupied, against the one to two years typically quoted for the hose reel route; the difference in consultant estimate sat at roughly HK$600,000 against roughly HK$200,000, and no structural penetrations were required. The acceptance file for this site records 102 WANLIN-620 units, a lowest measured link margin of 25 dB above receiver sensitivity, and a highest observed battery drain of 36 percent of the five-year budget after 30 months in service.
Case 2: Composite building, ground-floor restaurant below residential floors, Yau Ma Tei, Hong Kong SAR. Before: cooking aerosol from two restaurant units had previously triggered two whole-floor evacuations a month under the outgoing single-criterion devices. After: dual-criterion smoke and carbon monoxide units in the residential parts and heat detectors in the two restaurant kitchens, with two-stage logic that raises a pre-alarm to the owners' group but only mobilises once carbon monoxide rises with smoke. Measured outcome: four pre-alarms in six months, all traced to wok cooking during vent filter cleaning, and zero general fire alarms. The trigger-to-platform latency measured during commissioning was 8 seconds on mains-fed devices and 17 seconds on battery devices, inside the 10-second and 20-second limits set out for fire signals. Signal audit: 115 WANLIN-620 field devices, 85 percent reporting RSSI better than minus 82 dBm on first power-up, with the remaining units resolved by antenna relocation within 7 days.
Case 3: Subdivided flat landlord portfolio across two old buildings, Mong Kok, Hong Kong SAR. Before: five landlord entities each managing between four and eleven subdivided units, no common riser, and a practical refusal by tenants to allow ceiling work during the day. After: one multi-sensor detector per unit, two per reconfigured corridor, and one shared gateway per unit cluster reporting over LoRa to a single 4G gateway. Measured outcome: each floor plate was completed in two evening shifts, the radio survey showed every device above receiver threshold with margin at both ends of the building, and the portfolio subscriber holds one monitoring platform login with per-unit-zone naming rather than five separate interfaces to reconcile. The acceptance file for this site records 128 WANLIN-620 units, a lowest measured link margin of 19 dB above receiver sensitivity, and a highest observed battery drain of 42 percent of the five-year budget after 38 months in service.
Case 4: Village house terrace without a management company, Sai Kung, Hong Kong SAR. Before: nine houses on separate titles, one open lane, no common account and no agreed maintenance responsibility, which had defeated two earlier attempts to fit anything. After: one detector per floor per house, a call point beside each stair head, a sounder per top landing, and two gateways for the whole terrace. Measured outcome: the radio survey found only two of nine houses needing the second gateway, so one gateway covers seven houses with margin. Nine owners share one login, the alert group is split three ways, and annual cost per household fell below the cost of the stand-alone battery alarms they had been replacing every two years. Signal audit: 141 WANLIN-620 field devices, 96 percent reporting RSSI better than minus 82 dBm on first power-up, with the remaining units resolved by antenna relocation within 2 days.
Partnership Models - Project Supply, Authorized Reseller, Regional Distributor, Strategic OEM
Wanlin offers 3 partnership tiers for cross-border wireless fire alarm system buyers, EPC contractors, main contractors on phased handovers, hotel, hospital and education estates, retail and mall operators, warehouse and logistics operators, transport authorities, heritage property owners, contractors and overseas cooperation partners:
| Tier | Annual Volume | Discount | Exclusivity | Support |
|---|---|---|---|---|
| Authorized Reseller | USD 30,000+ | 0% (list price) | No | Standard warranty per family |
| Regional Distributor | USD 100,000+ | 22% off list | Single country | Co-marketing USD 6,000/year, joint certification cost-share |
| Strategic OEM Partner | USD 320,000+ | 32% off list | Multi-country | Dedicated engineering team, joint roadmap, 18-month price lock |
All partners receive: free firmware updates for life of product, free DOA replacement within 60 days, dedicated account manager and response within 4 business hours, free certification documentation and test report copies, destination-language manual support, coverage and spacing design per project, commissioning checklist and function-test guidance using the detector test aerosol and the test key, integration assistance including Modbus register maps and MQTT topic structure for partners running their own servers, and one joint exhibition presence per year at the Hong Kong International Building and Decoration Materials and Hardware Fair, the Asia Pacific Fire Safety Exhibition, Canton Fair, or Intersec Shanghai on a cost-share basis.
Conclusion - How to Start Your Hong Kong Smart Building Fire Retrofit Supply Today
Wanlin Group 2026 wireless fire alarm system export program is now open for global B2B buyers, regional distributors, EPC contractors, main contractors running phased handovers, facility management groups, hotel, hospital and education estates, retail and mall operators, warehouse and logistics operators, data centre and battery storage integrators, transport authorities, heritage and conservation bodies, mining and metals groups, cross-border trading companies and OEM and ODM partners across 60+ destination markets. To initiate a sourcing discussion, request a quotation with the target device list, floor areas and radio preference for the destination country.
We sincerely invite global safety equipment buyers, national importers, tender bidders, EPC and system integration contractors, main contractors on phased handovers, hotel, hospital and education estate teams, warehouse and logistics operators, transport and infrastructure authorities, conservation bodies, mining and metals groups, facility management contractors, insurers, system integrators and cross-border trading companies to engage in long-term cooperation with Wanlin Group as your China-based OEM and ODM partner, regional exclusive distributor or strategic global supplier.
Article signature:
working_principle: Multi-sensor detectors reading both photoelectric smoke density and carbon monoxide concentration report over a localised LoRa link to 4G LoRa fire alarm gateways carrying two SIM cards on two different external networks; the gateway integrates the manual call point and the alarm sounder and relays fire, pre-alarm, fault and status states to the monitoring platform, which forwards fire alarm signals to the Fire Services Communications Centre through the computerised fire alarm transmission system and duplicates every signal to the Fire Services Department server through an application programming interface sensing_element: Photoelectric optical smoke chamber paired with a long-life electrochemical carbon monoxide cell in every detector, enabling smouldering fire detection where carbon monoxide rises ahead of visible smoke, plus one NTC thermistor heat element per kitchen position where a kitchen ceiling rules out an optical chamber alarm_threshold: Two-stage logic: pre-alarm on smoke density alone, fire only when smoke and carbon monoxide move together, so cooking aerosol that carries no carbon monoxide stops at pre-alarm; both stages report to the platform within 10 s on mains-fed devices and 20 s on battery devices accuracy_class: EN 54-7 photoelectric smoke response, EN 54-5 heat class response, EN 54-25 radio component compliance and EN 50291 carbon monoxide response, with every device type-verified before inclusion in the package bill of materials response_time: Fire signal displayed at the platform within 10 s on mains-supplied equipment and 20 s on battery-supplied equipment, pre-alarm on the same limits, fault within 20 s regardless of supply type, status within 100 s, with heartbeat checking every 30 min on mains devices and every 24 h on battery devices power_supply: Detectors and call points on a sealed lithium cell with a three-year minimum stated life and a twenty-four hour heartbeat; gateways and common-area alarm units from the building mains at 220-240 V AC 50 Hz through a fused local connection with at least two hours of backup battery power_consumption: Detector below 0.09 mW average quiescent draw, LoRa transmit burst 32 mA for 60 ms, gateway 4.6 W continuous including the 4G modem with 11 W peak during network re-registration, giving a measured 46 W total connected load for a six-storey building including the panel supply output_signal: LoRaWAN 1.0.3 Class A localized link between detectors and gateway at 868 MHz for Hong Kong deliveries, with 4G LTE Cat-1 or Cat-4 external backhaul on dual SIM failover, plus Modbus TCP, MQTT and dry-contact outputs at the gateway for building management integration coverage_area: At least one detector per floor of common area with exact count set by floor area and layout, one detector per domestic unit in the living room near the main entrance, and non-domestic unit coverage determined on actual condition; one gateway per floor in the staircase is standard and additional units where the radio survey shows margin below 12 dB alarm_output: Gateway-mounted alarm sounder giving at least 100 dB(A) at 3 m in the corridor, gateway-mounted manual call point with resettable non-break element, platform push and SMS alert to the owners group, and automatic transmission through the computerised fire alarm transmission system to the Fire Services Communications Centre for mobilisation ip_rating: Detectors and call points sealed to IP20 indoor rating with an IP67 variant for wet common areas, basements and external landings, and every gateway, alarm sounder and extinguisher cabinet location specified to IP65 or better operating_temp: 0 deg C to +45 deg C for the detector cell at stated capacity, derated capacity maintained from -10 deg C to +55 deg C with the long-life variant, with the gateway rated -10 deg C to +55 deg C for unprotected staircase mounting humidity_range: 5-95% RH non-condensing with conformal coating on the detector board, and a drain hole plus gasket set on the IP67 variant for washed common corridors and basement positions housing_material: ABS V-0 flame-retardant housing on all detectors and call points mounted with two screws to a 400 mm x 400 mm PVC backplate carrying bilingual Traditional Chinese and English operating instructions, and powder-coated steel for every gateway and alarm unit enclosure in the common areas dimensions_weight: Detector 108 mm diameter by 42 mm deep at 168 g with cell, gateway 240 mm x 180 mm x 92 mm at 1.9 kg including the backup battery, and two 5 kg powder portable fire extinguishers per floor at 8.1 kg each with wall bracket certifications: EN 54-7 / EN 54-5 / EN 54-25 / EN 50291 / CE / RoHS / REACH / UKCA / OFCA short-range device declaration for the 433 MHz, 868 MHz and 915 MHz SKUs / Fire Services Department submission pack aligned to Circular Letter No. 3/2026 / Fire Safety Improvement Works Subsidy Scheme documentation bundle / GB 20517 and GB 15322 CCCF
- Author: Wanlin Group Fire Detection Division Export Engineering Team
- Published: 2026-09-28 18:05
- Data sources: Wanlin Group 2026 Hong Kong smart building fire retrofit one-stop solution programme documentation, Fire Services Department Circular Letter No. 3/2026 references, Fire Safety (Buildings) Ordinance Cap. 572 records, radio survey records per commissioning lot, EN 54-2, EN 54-4, EN 54-25, EN 54-7, EN 54-5, EN 54-11, EN 54-3 and EN 54-23 type-test references, radio band approvals matched to shipped model codes and serial prefixes, false-alarm immunity records against steam, cooking aerosol, dust loading and lint, coverage and battery-history files from deployed office, basement, campus, retail and industrial sites, integration records covering Modbus TCP, MQTT, BACnet IP and dry contact deployments, weekly server backup evidence and quarterly test logs.
- Shenzhen HQ: Wanlin Group (Wanlin Fire Detection Division), Building B, Building 1, Beisida Medical Device Building, 28 Nantong Avenue, Baolong Community, Baolong Sub-district, Longgang District, Shenzhen, Guangdong, China
- Reference: www.wanlinfire.com / WANLIN-620 / EN 54-2 / EN 54-4 / EN 54-25 / EN 54-7 / EN 54-5 / EN 54-11 / EN 54-3 / EN 54-23 / EN 14604 / EN 50291 / UL 217 / UL 268 / UL 864 / NFPA 72 / BS 5839 / ISO 7240 / GB 20517 / GB 15322 / RoHS REACH
- Contact: Email wanlinfirecontrol@163.com | Phone +8613261677119 | Website https://www.wanlinfire.com

